News

Stock

NFEC 2.75   0.00 (0.00%)  

Recent Projects

Fuxin Mining Bureau Methane Project

  • Purpose: To remove and utilize the Methane in Fuxin coal mine to produce electricity
  • Background: BOT project, NF Energy’s invested RMB14.1m for equipment including internal combustion engines, gas pipe lines, water cooling system, electrical system, transformers, automated monitoring system and other ancillary facilities.
  • Construction time: 4 months
  • Revenue split: 80% to NF Energy
  • Term: 3 years. After which the electric generation equipment reverts back to Fuxin Mining Bureau