News
Stock
NFEC 2.75 0.00 (0.00%)
Recent Projects
Fuxin Mining Bureau Methane Project
- Purpose: To remove and utilize the Methane in Fuxin coal mine to produce electricity
- Background: BOT project, NF Energy’s invested RMB14.1m for equipment including internal combustion engines, gas pipe lines, water cooling system, electrical system, transformers, automated monitoring system and other ancillary facilities.
- Construction time: 4 months
- Revenue split: 80% to NF Energy
- Term: 3 years. After which the electric generation equipment reverts back to Fuxin Mining Bureau